test.jsmyriad.com

Car seat assembly line with industrial machinery
OEM / ODM

Your Factory Floor, Our Building

Tooling, textiles, foam, assembly and homologation for brands that need their own car seat range.

Home  /  Solutions

How We Work

Four Ways to Put Your Name on a Seat

OEM

You bring the drawing, we build the tool, mould the shell, sew the cover and ship under your brand.

ODM

Pick from our proven platforms, then change the cover, colours, inserts and packaging.

Private label

Our stock models with your logo, manual, labelling and carton artwork.

Component supply

Shells, foams or covers supplied to your own assembly line.

Process

From Brief to Container in 90 Days

01

Brief & target market

Regulation, price band, retail channel and volume. We reply with a feasibility note in 48 hours.

02

Design & tooling

3D review, DFM feedback, mould build. Typically 25–35 days for a new shell.

03

Sample & test

Pre-production samples plus sled and bench testing to ECE R129 or FMVSS 213.

04

Homologation

Type approval support, CCC for China, and documentation for your customs.

05

Mass production

14 assembly lines, 100% end-of-line inspection, FOB / CIF / DDP delivery.

Close up of breathable fabric and stitching on a car seat
Capability

Everything Under
One Roof

Owning the process is how we keep a promise on quality and a promise on dates.

  • In-house injection moulding — 26 machines, 80–1,300 t
  • Foam plant with density control to ±3%
  • Automotive-grade sewing cells, 120 operators
  • Accredited crash-test laboratory on site
  • Colour lab and salt-spray / abrasion testing
Commercials

MOQ and Lead Times

Order typeMOQSample lead timeProduction lead time
Stock model, private label300 pcs5 days25–30 days
Colour / fabric change500 pcs12 days35 days
New cover on existing shell1,000 pcs18 days40 days
New shell (OEM)3,000 pcs35 days75–90 days

Figures are indicative and confirmed per project. Tooling is quoted separately and owned by you.

START A PROJECT

Send us your target price and volume

We will come back with a costed, certifyable proposal within two working days.

Scroll to Top